Building pics – Stage 2

Stage 2 completed in 2015 consisted of much need storage rooms added. This was achieved by extending outwards at the rear of the church hall. Access to this area was provided by two entry doors from the hall. This storage area is used for excess furniture such as chairs, plus a vast collection of equipment used by various church groups.